Let me first explain what I have noted:
During patch-set run executed with Prometheus, the execution time of the patch increase during the patch-set. They are patch-set with at maximum 3500 patches and with not more than 20 RGB levels.
The issue can be replicated with virtual probe. What i did was to run a 6 cube starting from a 21 cube measurement (close to 10000 patches) and the same one with CS clean measurements.
From
this recording you can visually note the difference. Basically the same patch-set execution is doubled when run over an already measured patch-set.
Honestly I would expect some differences (CS always check if a patch has been measured to overlap it), but doubling? Also because I see similar execution with the 5500 patch-set I have pointed
here, with that (absurd) number of RGB levels.
It is difficult for me to tell what is the root cause, so I cannot tell if I am spotting a bug, or a possible Wibini